The Ashton under Lyne, Stalybridge & Dukinfield Joint Committee obtained an Act of Parliament in 1958 enabling it to build the reservoir. The committee engaged G.H. Hill & Sons as engineers and the contractor was A. E. Farr & Company. J.B. Blayney was employed as landscape architect as required by the Act. Work started in 1960 and was finished in October 1966.
The dam's earth embankment is 38 metres high and 550 metres in length. It is 4.25 metres wide at the crest and is 183 metres at the widest point at its base. A concrete cutoff in a 23 metre deep trench makes a seal between the foundations and the earthworks preventing leaks. Above the concrete cutoff is the clay core. Dovestone is possibly the last large dam to be built in Britain with a conventional puddle clay core. The volume of the dam is 34,000 cubic metres